Aker Solutions ASA: Aker Solutions secures Troll Phase 3 stage II topside modification contract
September 30, 2024 – Aker Solutions has been awarded a sizeable[1] EPCIC contract by Equinor to prepare the topside of Troll A for accelerating production from the Troll West gas reservoir.The Troll field is situated in the North Sea, 80 km northwest of Bergen, and is Norway’s largest gas producer, supplying 10 percent of Europe’s total gas needs. Troll Phase 3 involves producing the gas cap overlying the oil column in Troll West, while also continuing the production of oil. The produced gas goes to Troll A and onwards in existing infrastructure. The scope includes engineering,