Atria builds meat production plant and logistics centre in Russia
Atria Group plc STOCK EXCHANGE RELEASE 25 October 2006
Atria builds meat production plant and logistics centre in Russia
The Board of Directors of Atria Group plc has accepted an extensive investment
programme to build a new logistics centre and meat production plant in Russia.
The new production plants will be built in the St. Petersburg area and will be
completed by the end of 2008. The value of the investment is approximately EUR 70
million.
For additional information, please contact Mr Matti Tikkakoski, President and
CEO, tel. +358 50 2582.
ATRIA GROUP PLC
Matti Tikkakoski
President and CEO
DISTRIBUTION
Helsinki Stock Exchange
Principal media
www.atria.fi