• news.cision.com/
  • CTT Systems/
  • CTT Systems AB receives an order, from Associated Air Center on the Cair™ System for one VIP Boeing BBJ747-8 aircraft.

CTT Systems AB receives an order, from Associated Air Center on the Cair™ System for one VIP Boeing BBJ747-8 aircraft.

Report this content

Nyköping, Sweden, January 11, 2013, – Associated Air Center (AAC) in Dallas, USA has ordered the CTT Cair™ System to be installed during 2013/2014 in one Boeing BBJ 747-8 aircraft.

“Our clients are among the world’s most prominent and distinguished, therefore our completions projects must incorporate the finest in in-flight cabin comfort systems,” said Patricio Altuna, AAC Executive Vice President, Sales & Marketing. “Using CTT’s, CairTM System supports this objective.”

This is the fifth CairTM System order from Associated Air Center. Earlier AAC has installed the CairTM system in an A330-200, B767-200, A319 and one BBJ1 aircraft. We are very pleased and proud that AAC also selected CTT to provide the CairTM system for their VIP B747-8 outfitting contract says Peter Landquist, Vice President Sales & Marketing of CTT Systems.

Cair™ is focused on the passengers’ health and comfort by providing humidification of the extremely dry aircraft cabins without causing condensation. Cair™ gives a pleasant relative humidity of around 20%, compared to 3-5% without, for the passengers, thereby reducing dry air related problems (e.g. fatigue, jet-lag, red eyes, dry skin, spread of virus diseases).

The Cair™ system is based on evaporative cooling technology and uses a method that effectively precludes the transfer of bacteria within the aircraft. The dual-purpose system increases humidity for greater comfort and incorporates the Zonal Drying™ System to counter condensation problems.

CTT’s Zonal Drying™ System has been selected as basic equipment for the new B787 “Dreamliner” and CTT’s humidifiers are options in crew rest compartments and on flight deck. The A380 offers CTT’s humidifiers as option in crew rest compartments. CTT will also supply the Zonal Drying™ system and the Cair™ system for the A350 aircraft, as options.

Standard Aero’s Associated Air Center provides world-class program management and ODA certification authority to keep airplane programs on schedule and provides industry-leading experience and warranty support after delivery. The company’s vertically-integrated, state of the art facility employs the most advanced engineering in the industry along with operational excellence and superior customer service from start to finish.

For additional information:

Torbjörn Johansson, President, CTT Systems AB.

Tel. +46-155-205901 alt. mobile. +46-70-6652446, or E-mail: torbjorn.johansson@ctt.se

OR,

Peter Landquist, VP Sales & Marketing CTT Systems AB

Tel. +46-155-205902alt. mobile.+46-70-6652445, or E-mail peter.landquist@ctt.se

Also visit: www.ctt.se

CTTs products Zonal Drying ™, Cair ™, Flight Deck and Crew Humidifier are standard or optional equipment on Boeing B787, Airbus A350 and A380. CTT has today more than 450 systems installed in more than 30 airlines worldwide. CTT has now 20 years of operating experience on the Zonal Drying ™ system plus 14 years on Cair ™ and Crew Humidifier systems. IATAs report on fuel-saving measures is now including Zonal Drying ™ as one of the few available fuel-saving systems for retrofitting.

Documents & Links