Clear improvement in production, but profitability remains a challenge
Q2-2017 (Q2-2016) · Gold production was 107.4 kg (73.7), with the increase driven by higher gold grade, improved production efficiency and increased tonnage · Milled ore was 47,621 tonnes (37,303) at head grade of 2.7 g/t (2.4) · Cash Cost was 1,124 USD/oz (1,396) · Revenue was 34.7 MSEK (20.9) · EBITDA was 0.5 MSEK (-4.8) · Profit after tax was -9.8 MSEK (-13.5) · Earnings per share was -0.93 SEK (-1.29) H1-2017 (H1-2016) · Gold production was 205.3 kg (132.2) · Milled ore was 88,425 tonnes (72,620) at head grade of 2.8 g/t (2.2) · Cash Cost was 1,162