• news.cision.com/
  • NKT/
  • NKT boosts offshore installation capabilities with upgrades of cable-lay vessel NKT Victoria

NKT boosts offshore installation capabilities with upgrades of cable-lay vessel NKT Victoria

Report this content


NKT has accumulated unmatched operational experience and track record by operating NKT Victoria since 2017. The company remains committed to maintain her market leading position by enhancing the capabilities, efficiency and reliability with conti.nuous technical upgrades

Press Release
4 July 2024


With increased cable load capacity, improved station keeping and added installation capabilities, NKT Victoria continues to be a leading cable-laying vessel (CLV) in the offshore market. Since her maiden voyage in 2017, NKT Victoria has installed high-voltage power cable systems across Europe, establishing herself as a key asset for NKT. The recent upgrades to this purpose-built cable-laying vessel were prompted by growing market demand and customer requirements.

 

- NKT Victoria, her skilled crew and our engineers consistently deliver outstanding results, earning high satisfaction from our customers. With these recent technical enhancements, we maintain her position at the forefront of energy efficiency and operational accuracy. The continued upgrades are extending our in-house installation capabilities preparing to meet future demands for efficient and reliable execution, says Darren Fennell, Executive Vice President and Head of HV Solutions in Karlskrona.

 

Since 2017 NKT Victoria has set new industry standards for energy efficiency and operational technologies, ensuring unprecedented precision during cable laying. To minimize her carbon footprint, NKT Victoria utilizes power-from-shore during cable loading, along with onboard technologies like Azipod propulsion units, energy storage system and ABB Marine’s Onboard DC Grid. These features significantly reduce fuel consumption. Additionally, in 2023, she obtained certification to operate using the biofuel hydrotreated Vegetable Oil (HVO), further decreasing her offshore operations’ environmental impact.

 

NKT is currently expanding its fleet by adding a second cable-laying vessel, NKT Eleonora, to meet the growing demand for offshore power cable solutions. NKT Eleonora is scheduled to become operational in 2027.

Key upgrades:

  • Increased load capacity: 11,000 tons (confirmed by DNV) from the previous 9,000 tons
  • Improved positioning with an additional Azimuth retractable thruster placed in the middle of the hull
  • Elevated Horizontal Lay System (EHLS) customized for design for installation of dynamic power cables from NKT Victoria
  • Integrated Jet Plough enabling reliable simultaneous laying and burial operations
  • Certified for operating on the biofuel hydrotreated vegetable oil (HVO) since 2023

 

 

 

With increased cable load capacity, improved station keeping and added installation capabilities,
NKT Victoria continues to a the leading cable-lay vessel in the offshore market.

 

Contact
Pelle Fischer-Nielsen, External Communications Lead 
+45 2982 0022 / pelle.fischer-nielsen@nkt.com 

 

 

About NKT

NKT connects a greener world with high-quality power cable technology and takes centre stage as the world moves towards green energy. NKT designs, manufactures and installs low-, medium- and high-voltage power cable solutions enabling sustainable energy transmission. Since 1891, NKT has innovated the power cable technology building the infrastructure for the first light bulbs to the megawatts created by renewable energy today. NKT is headquartered in Denmark and employs 5,000 people. NKT is listed on Nasdaq Copenhagen and realised a revenue of EUR 2.6 billion in 2022. NKT - We connect a greener world. www.NKT.com.

Subscribe

Media

Media

Documents & Links