• news.cision.com/
  • NKT/
  • NKT completes inspection survey and remediation work on the HVDC East West interconnector for TSO EirGrid

NKT completes inspection survey and remediation work on the HVDC East West interconnector for TSO EirGrid

Report this content

NKT has completed inspection survey and remediation work on the East West interconnector that links Ireland and Great Britain. The specialized inspection and remediation work allows the owner, EirGrid Interconnector Designated Activity Company (EIDAC), a subsidiary of the EirGrid Group, to ensure that the cable is brought back to optimal conditions.

Press Release

13 May 2024

To optimize performance and enhance longevity of its interconnector, EIDAC, recently had NKT inspect the East West HVDC interconnector between Ireland and Great Britain. The inspection survey is part of a long-term service agreement between the two companies.

 

Commenting on the work, EirGrid’s Chief Operations Officer, Rodney Doyle said: EirGrid has a long-standing partnership with NKT as we work together to secure the condition of the East West Interconnector. As the interconnector is a critical piece of infrastructure between Ireland and Great Britain it is essential that it is maintained in an optimal condition. The recent survey showed the necessity of remediation work on sections of the cable. These works are now complete ensuring the continuity of supply between Ireland and Great Britain.

 

The survey conducted by NKT including characterization of seabed conditions along the cable led to concrete mattresses and rock bags being placed under exposed sections of the East West interconnector.

Carrying out periodic cable inspection surveys ensures that the cable can withstand extreme conditions and perform safe operations. A precise analysis and mitigation plan is a key element for preventing cable failures and reducing downtime. NKT’s offshore engineering centre can analyse cable survey data, providing the customer with 360-degree cable expertise.

- We are pleased to announce that both the inspection survey and remediation work following the survey are now successfully completed. The inspection survey led to remediation work being done for EIDAC, using our vessel NKT Victoria. EIDAC is a long-standing partner to NKT, and the long-term service agreement is a testament to the strong collaboration between our companies to jointly optimize performance of their interconnector, says Axel Barnekow Widmark, Executive Vice President, Service at NKT.

 

As offshore assets are placed in harsh environments, subsea cables are continuously subjected to extreme conditions. This exposes them to different kinds of surface or subsurface objects around the cable. Anchoring or fishing gear may also strike exposed sections of the cable or mechanical faults may happen in areas where the seabed is uneven. With regular inspection, emerging changes to the cable’s environment can be identified and potential cable failures can be prevented contributing to improving the operational performance of the cable.

 

Contact
Lene Christoffersen, Communications Partner, Tel.: +45 2337 2105, email: lene.christoffersen@nkt.com.

 

A blue and white ship in the water

Description automatically generated

NKT Victoria was in operation for the inspection survey and remediation work done EIDAC’s East West interconnector between Ireland and Great Britain.

 

About NKT

NKT connects a greener world with high-quality power cable technology and takes centre stage as the world moves towards green energy. NKT designs, manufactures and installs low-, medium- and high-voltage power cable solutions enabling sustainable energy transmission. Since 1891, NKT has innovated the power cable technology building the infrastructure for the first light bulbs to the megawatts created by renewable energy today. NKT is headquartered in Denmark and employs 5,000 people. NKT is listed on Nasdaq Copenhagen and realized a revenue of EUR 2.6 billion in 2023. NKT - We connect a greener world. www.NKT.com.