Mjostornet-3D-2


Fotograf: Voll Arkitekter AS and EVE Images (rendered images), Moelven / Sweco (models)

Concrete will be used between the floors of the Tower’s top seven storeys. The weight in the upper storeys makes the swaying slower.

Lav oppløsning

Høy oppløsning

Normal oppløsning

Abonner