Panoro Energy – Group Operations Update: Dussafu Production Reaches 40,000 bopd
Oslo, 15 November 2024 – Panoro Energy ASA (“Panoro” or the “Company”) is pleased to provide an operations update in advance of its Q3 2024 results which are scheduled for release on 20 November 2024. At the Dussafu Marin Permit offshore Gabon gross production has reached targeted levels of 40,000 bopd, while in Equatorial Guinea the first of two planned infill wells was successfully put onstream at an initial gross rate in excess of 5,000 bopd on a restricted choke, in line with expectations. As a result, Panoro’s group working interest production has averaged approximately 12,500