Saab signs contract with Swedish FMV for a third GlobalEye

Report this content

Saab has today signed a contract with the Swedish Defence Materiel Administration (FMV) regarding delivery of a third GlobalEye airborne early warning and control aircraft to Sweden. The order value is approximately SEK 2.6 billion and the delivery period is 2024-2029.

The order is based on an option included in Saab’s contract with FMV from June 2022 which included two GlobalEye as well as options to procure two additional aircraft. GlobalEye has the Swedish designation S 106.

“We are proud to contribute to Sweden’s defence with another GlobalEye aircraft, which will provide unique situational awareness of the surroundings as well the capability of early detection and warning of potential threats in the air, at sea or on land,” says Micael Johansson, President and CEO of Saab. 

GlobalEye is an advanced multi-domain AEW&C solution with an array of active and passive sensors that provide long-range detection and identification of objects in the air, at sea and over land. By providing real-time information to units in air forces, armies and navies, GlobalEye enables enhanced situational awareness of the surrounding areas and early detection of threats.

More about GlobalEye: www.saab.com/globaleye-presskit

Contact

Mattias Rådström 
Head of Media Relations
+46 (0)734 180 018
presscentre@saabgroup.com

Saab is a leading defence and security company with an enduring mission, to help nations keep their people and society safe. Empowered by its 22,000 talented people, Saab constantly pushes the boundaries of technology to create a safer and more sustainable and world. Saab designs, manufactures and maintains advanced systems in aeronautics, weapons, command and control, sensors and underwater systems. Saab is headquartered in Sweden. It has major operations all over the world and is part of the domestic defence capability of several nations.

The information is such that Saab AB is obliged to make public pursuant to the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact person set out above, on 27 June 2024 at 14:00 (CET).