Beatson Clark Builds New White Flint Furnace

Report this content

News release

21st August 2012

A new £5.4 million white flint furnace is now fully operational at glass manufacturer Beatson Clark.

The furnace has a daily capacity of approximately 200 tonnes of glass and gives Beatson Clark in Rotherham the same size melting area of 70.6m² as the previous furnace.

However, an improved design will mean greater efficiency and reduced CO2 emissions in line with new Government targets.

The new equipment now utilises the flame length to burn more gas, thereby reducing NOx emissions* by over 20 per cent.

Improvements to the regenerators and an increased wall height have increased the combustion volume, which means that more heat can be recycled.

Meanwhile a new burner system with an oxygen trim facility ensures combustion is optimised, further increasing efficiency.

Around 80 contractors have been involved in the rebuild and maintenance project, including Sheffield-based Tecoglas who designed the furnace, Chapman Brack who have undertaken the rebuild and Batts Engineering of Rotherham who fabricated and installed the structural furnace steelwork.

The furnace rebuild is just part of a major £10 million investment which Beatson Clark has made in plant and equipment at its Rotherham base this year.

A successful repair was made to the amber furnace in December 2011 and Beatson Clark has also installed new vision based inspection equipment at its factory.

“Our staff have worked closely with the contractors to ensure a smooth installation,” said Beatson Clark’s Furnace Manager Dean Duke.

“The new furnace and the major maintenance work that has been undertaken will enable us to continue to produce quality glass for our customers for years to come.”

*NOx is a generic term for nitric oxide and nitrogen dioxide which are produced from the reaction of nitrogen and oxygen gases in the air during combustion, especially at high temperatures.

Notes to editors

Beatson Clark specialises in providing glass packaging solutions for niche brands in the food, drink and pharmaceutical markets worldwide. The key to its success has been flexibility, innovation and the high quality of its containers.

Beatson Clark’s customers are at the core of its business and the company is proud of the long-standing partnerships it has developed thanks to the outstanding level of service it offers.

Beatson Clark has a turnover of £44 million and a production capacity of approximately 496 million units or 88,000 tonnes.

It has ISO 9001:2000,BRC/IOP Food Packaging Hygiene Standard and OHSAS 18001:1999 Occupational Health & Safety Standard and its manufacturing capability has an emphasis on flexibility to facilitate short tailored production runs. It has a UK distribution centre located in Rotherham.


Jez Ashberry
Shooting Star PR
01522 528540
jez@shootingstar-pr.co.uk
www.shootingstar-pr.co.uk
t: @jezashberry

Tags:

Media

Media

Documents & Links

Quick facts

Glass manufacturer Beatson Clark has built a new white flint furnace as part of a £10 million investment in plant and equipment
Tweet this

Quotes

The new furnace and the major maintenance work that has been undertaken will enable us to continue to produce quality glass for our customers for years to come
Dean Duke, Furnace Manager at Beatson Clark