Stegra and Uniper enter 6 TWh electricity agreement
Stockholm, 27 November 2024 –Stegra and Uniper have signed a long-term agreement for the supply of 6 TWh of electricity to Stegra’s plant in Northern Sweden.In a long-term power purchase agreement (PPA) with Uniper, Stegra secures a yearly supply of electricity produced over the 6-year period ranging from 2027-2032, covering a total of 6 TWh. Stegra’s plant in Boden will produce green hydrogen, green iron and green steel, at large scale. The initial annual volume will be 2.5 million tonnes of green steel and operations will start in 2026. Significant volumes of electricity are needed