ArcelorMittal WireSolutions signs contracts to supply steel fibres to the Doha Metro project in Qatar

Report this content

Luxembourg, 22 May 2015 - ArcelorMittal WireSolutions has signed three contracts to supply approximately 21,500 tonnes of steel fibres to the Doha Metro in Qatar, strengthening ArcelorMittal’s position as a leading supplier of steel fibre to the tunnelling industry.

The contracts represent ArcelorMittal WireSolutions’ first delivery of steel fibres to the Middle East and are the company’s largest steel fibre contracts to date, opening the door for further opportunities in the region and worldwide.

Currently under construction for an investment of €32 billion, the Doha Metro, operated by Qatar Rail, will be one of the most advanced metro systems in the world. 300km long and comprising 98 stations, Phase 1 of the network is due for completion in October 2019.

Red Line South
ArcelorMittal WireSolutions has signed a contract with a consortium led by QDVC[1] to supply 7,520 tonnes of HE++ 90/60 premium steel fibres for the production of tunnel lining segments for the Doha Metro’s Red Line South. Deliveries are being made from April 2014 to June 2016.

Red Line North
ArcelorMittal WireSolutions will also supply 7,500 tonnes of HE++ 75/50 for the production of tunnel lining segments to Doha metro’s Red Line North in a contract signed with precast manufacturer SMEET. Deliveries began in April 2014 and will continue until 2016. A consortium led by Italian company Impregilo[2] is responsible for construction of the line.

Golden Line
The third contract, signed with Qatari construction materials supplier CCI (Commodore Cement Industries), involves the supply of 6,400 tonnes of HE++ 90/60 to the Doha metro’s Golden Line, also for the production of tunnel lining segments. Deliveries are being made from November 2014 to July 2016. The line is being constructed by a JV led by Aktor[3]. ArcelorMittal’s DSTC offices in Dubai and Qatar worked closely with ArcelorMittal WireSolutions to fulfil project delivery requirements.

Steel for all three projects is being produced in ArcelorMittal WireSolutions sites from Bissen, Luxemburg, Sheffield, UK and Syców, Poland.

Meanwhile, ArcelorMittal WireSolutions’ participation in the €20.6 billion London Crossrail project, Europe’s biggest infrastructure project, is nearing completion. Between 2011 and 2013, ArcelorMittal Wiresolutions signed three multi-million pound contracts to supply a total of 12,000 tonnes of steel fibres for London Crossrail, representing the biggest total delivery of steel fibres in the entire project. Deliveries have been successfully completed for two of these contracts, Project C305 and project C310.

The use of two new premium-quality steel fibre grades, HE++ 55/35 and HE++ 90/60, specially developed for this project, was key to winning the contracts, which represent the company’s first infrastructure contracts in the UK for steel fibres. The steel is being supplied from ArcelorMittal WireSolutions’ sites in Sheffield, UK, and Bissen, Luxemburg.

The Doha Metro and London Crossrail are two prestigious global references which strengthen ArcelorMittal WireSolutions’ position as a reliable, competitive partner in the international tunnelling sector. 

“These are two excellent examples of our leading position in the steel fibre business, demonstrating how we offer our customers best-in-class service and support for their projects. ArcelorMittal WireSolutions remains a strong solutions provider and a reliable partner to all our customers in the tunnelling industry. With this success, we have strengthened our team of tunnelling specialists in the company,” says José Ramón González, Steel Fibre Manager.


[1] Consortium led by QDVC, a JV between Qatari Diar & Vinci Construction Grands Projets. Includes GS Engineering & Construction, Al Darwish Engineering

[2] Consortium led by Italian construction company Impregilo. Includes South Korea's SK Engineering & Construction and Qatar's Galfar Engineering & Contracting

[3] JV led by Athens-based Aktor and comprising Larsen and Toubro, YapiMerkezi, STFA and Al Jaber Engineering.

Press contact: Arne Langner, arne.langner@arcelormittal.com

About ArcelorMittal

Europe
ArcelorMittal employs more than 100,000 people and produces approximately half of its total steel volume in Europe. With a presence in 17 European countries and around 400 different sites, ArcelorMittal Europe had revenues of €35 billion and a crude steel production of 43 million tonnes in 2014. We supply flat and long steel products for all major steel markets, including the automotive, construction, packaging and household appliances industry – supported by a leading R&D and distribution network with 9 laboratories and 1,000 full-time researchers in Europe.

Worldwide
ArcelorMittal is the world's leading steel and mining company, with a presence in 60 countries and an industrial footprint in 19 countries. Guided by a philosophy to produce safe, sustainable steel, we are the leading supplier of quality steel in the major global steel markets including automotive, construction, household appliances and packaging, with world-class research and development and outstanding distribution networks.

Through our core values of sustainability, quality and leadership, we operate responsibly with respect to the health, safety and wellbeing of our employees, contractors and the communities in which we operate.

For us, steel is the fabric of life, as it is at the heart of the modern world from railways to cars and washing machines. We are actively researching and producing steel-based technologies and solutions that make many of the products and components people use in their everyday lives more energy efficient.

We are one of the world’s five largest producers of iron ore and metallurgical coal and our mining business is an essential part of our growth strategy. With a geographically diversified portfolio of iron ore and coal assets, we are strategically positioned to serve our network of steel plants and the external global market. While our steel operations are important customers, our supply to the external market is increasing as we grow.

In 2014, ArcelorMittal had revenues of US$79.3 billion and crude steel production of 93.1 million tonnes, while own iron ore production reached 63.9 million tonnes.

ArcelorMittal is listed on the stock exchanges of New York (MT), Amsterdam (MT), Paris (MT), Luxembourg (MT) and on the Spanish stock exchanges of Barcelona, Bilbao, Madrid and Valencia (MTS).

For more information about ArcelorMittal please visit: http://corporate.arcelormittal.com/

Tags:

Media

Media

Documents & Links

Quick facts

ArcelorMittal WireSolutions has signed three contracts to supply approximately 21,500 tonnes of steel fibres to the Doha Metro in Qatar.
Tweet this
The contracts represent ArcelorMittal WireSolutions’ first delivery of steel fibres to the Middle East and are the company’s largest steel fibre contracts to date.
Tweet this
Steel for all three projects is being produced in ArcelorMittal WireSolutions sites from Bissen, Luxemburg, Sheffield, UK and Syców, Poland.
Tweet this
The Doha Metro and London Crossrail are two prestigious global references which strengthen ArcelorMittal WireSolutions’ position as a reliable, competitive partner in the international tunnelling sector.
Tweet this

Quotes

These are two excellent examples of our leading position in the steel fibre business, demonstrating how we offer our customers best-in-class service and support for their projects. ArcelorMittal WireSolutions remains a strong solutions provider and a reliable partner to all our customers in the tunnelling industry. With this success, we have strengthened our team of tunnelling specialists in the company.
José Ramón González, Steel Fibre Manager