BlueNord: Preliminary Production for October 2024
Oslo, 6 November 2024: BlueNord ASA ("BlueNord" or the "Company") has today announced its preliminary production figures for October 2024. The Company had a preliminary production in October of net 23.4 mboepd from Dan, Gorm and Halfdan. Of this, 0.3 mboepd of gas was consumed on Tyra during the ongoing commissioning work, such that the net export production figure was 23.1 mboepd net to BlueNord. Production from the Tyra hub was temporarily halted in October in connection with the upcoming restart of the facilities. The production from Halfdan and Gorm was lower in October compared