Office of Naval Research grant to allow UTA researcher to study configuration, integration challenges of high-power, intermittent load power sources
Battery testerThere is a continuing effort by the U.S. Navy to integrate energy storage throughout their fleet of vessels. Many batteries may be used to supply high power to intermittently operated loads and it is important to have a way to test how those batteries will perform under operational conditions before the ship is at sea. David Wetz, an associate professor of electrical engineering at The University of Texas at Arlington, will utilize a Defense University Research Instrumentation Program or DURIP award for $689,335 to design, build, and install a roughly 150 kilowatt