Quick concrete repair boxed off for Weidenhammer
Water penetration into a machine pit has been permanently prevented in just two days for Weidenhammer Packaging Group, Europe’s leading supplier of composite cans, composite drums and plastic containers. The moisture issue initially became apparent as a crack appeared along one machine pit floor at Weidenhammer’s Bradford composite can manufacturing facility. The issue needed to be resolved swiftly so that the machine pit could be put back into operational service, without compromise to the integrity of the manufacturing process and without delay. Source One Environmental were