16,000th PONSSE forest machine completed
The 16,000th PONSSE forest machine was completed in the end of September at Ponsse’s factory in Vieremä, Finland. The PONSSE Ergo harvester delivered to Celulose Nipo-Brasileira S.A. (CENIBRA) will operate at eucalyptus plantations in Brazil to meet the needs of local pulp production.“Ponsse has worked in close cooperation with Cenibra since 2014 in extremely difficult slope conditions in the state of Minas Gerais in Brazil. This cooperation has given our R&D valuable information about wood harvesting needs in steep slope conditions. As a result of this co-operation we have been able to