Vestas wins 252 MW EPC order in Egypt
News release from Vestas MediterraneanMadrid, 30 September 2020 The New and Renewable Energy Authority (NREA) has placed a 252 MW order with Vestas for the Gulf of Suez 1 wind project in Gulf of Suez, Egypt. Vestas has developed a solution that comprises the supply and installation of 70 V105-3.45 MW wind turbines in 3.6 MW Power Optimised Mode and a three-year Active Output Management 4000 (AOM 4000) service agreement, capable of maximising the project’s annual energy production, while meeting the local tip-height restriction and the national grid code requirements. Leveraging