Successful Blythe Development Well Flow Test
29 September 2021 IOG plc Successful Blythe Development Well 48/23a-H1 Flow Test IOG plc ("IOG", or "the Company"), (AIM: IOG.L), the Net Zero UK gas and infrastructure operator focused on high return projects, is pleased to provide an update on the Blythe well 48/23a-H1, the second Phase 1 development well. Highlights · Blythe well successfully drilled, cleaned up and flow tested to a maximum gas rate of 45.5 mmscf/d through an 80/64[th] inch choke within two months of spud · Gas in place and recoverable volumes at Blythe are estimated to be in line