Multi-Link Terminals Ltd Oy orders Konecranes ship-to-shore crane for its Helsinki terminal
Multi-Link Terminals Ltd Oy orders Konecranes ship-to-shore crane for its Helsinki terminal Multi-Link Terminals Ltd Oy operating in the Port of Helsinki, Vuosaari, has ordered a large Konecranes ship-to-shore (STS) crane. The contract was signed in February 2018 and the crane will be delivered in 2019. Multi-Link Terminals Ltd Oy (MLT) has been a long-standing customer of Konecranes. The Konecranes STS on order will have a railspan of 48m, a lifting height of 31m, an outreach of 40m and a backreach of 20m, making it the biggest widespan STS crane ever made by Konecranes.MLT will