PLAGAZI AND DILLINGER ENTER A PRE-STUDY AGREEMENT
Original date: December 13, 2019 Plagazi AB and Dillinger GmbH have entered an agreement to conduct a pre-study for constructing a Plagazi waste-to-hydrogen plant. The pre-study will highlight the feasibility to include a Plagazi plant at their steel mill facility in Dillingen, Saar. The hydrogen produced can be used as a reduction agent in their blast furnace and replace the usage of coke, thereby substantially reducing their CO2 emissions. The waste used for the process would come from Dillinger’s current steel production process.More about the Dillinger GmbH: https://www.dillinger.