AFRY awarded a new contract by NordWasser in Rostock
AFRY is awarded a new contract for the modernization of Rostock's water infrastructure as part of the KLAS Engineering consortium together with the engineering firm Regierungsbaumeister Schlegel (IB Schlegel).The Werftstraße wastewater pumping station in Rostock was built in the 1960s and no longer meets technical requirements. In addition, the heavy rain events that have become more frequent in the meantime have led to flooding of the area in some cases. NordWasser GmbH, responsible for water supply and wastewater disposal for the city of Rostock, has therefore promoted a corresponding