Exploration during 2012 has successfully replaced almost all the Ore reserve mined
Endomines is making a public announcement of its updated ore reserves and mineral resource estimates. The estimates have been prepared according to the 2012 Australasian Code for Reporting of Mineral Resources and Ore Reserves (Joint Ore Reserve Committee - JORC-code). The updates have been prepared by external professional consultants at Outotec (Finland) Oy, JK-Kaivossuunnittelu Oy and in house Endomines. The update represents the Pampalo production situation as at 31stDecember 2012. “The Pampalo mine gold production in 2012 was 867 kg but the total contained gold in the Pampalo ore