Wärtsilä gas conversion project will accelerate Senegal’s move to cleaner energy production
Wärtsilä Corporation, Press release, 12 April 2021 at 10:00 AM EESTThe technology group Wärtsilä will convert the close to 90 MW Bel-Air power plant in Dakar, Senegal to operate on liquefied natural gas (LNG). The plant, which is owned by Senelec, Senegal’s public utility company, currently operates on heavy fuel oil. The conversion will future-proof the facility as Senegal’s long-term strategy is to lower the carbon footprint of energy production by switching to gas when a domestic supply is available. This project is part of an interim LNG-to-Power ‘bridge’ solution, and is the first ever