BlueNord: Preliminary Production for December 2023 and Full Year 2023
Oslo, 8 January 2024: BlueNord ASA ("BlueNord" or the "Company") has today announced its preliminary production figures for December 2023 and for the full year of 2023. The Company had a preliminary production in December of net 24.1 mboepd. The production during the month was stable across all producing hubs, and in particular strong on the Halfdan and Gorm hubs delivering a preliminary operational efficiency above 90%. The preliminary production for the full year of 2023 was 24.9 mboepd which is in the upper range of the yearly production guidance of 24.5 – 25.0 mboepd. This