Fortum to supply low-NOx combustion technology for Krakow power plant
FORTUM CORPORATION PRESS RELEASE 30 NOVEMBER 2016Fortum will supply secondary measure technology to reduce the nitrogenemissions (SNCR – Selective Non-Catalytic Reduction) on two boilers at acoal-fired power plant in Krakow, Poland owned by EDF Group. The installationswill be erected in years 2017 (one boiler) and 2018 (second boiler).“The delivery is a continuation of the combustion technology renewal projectimplemented at the Krakow power plant for which Fortum has provided expertservices and technology. The systems delivered by Fortum will bring thenitrogen emissions of the