AFRY to design part of Ostkustbanan in Sweden
The Swedish Transport Administration, Trafikverket, is planning to increase the capacity on Ostkustbanan by building double tracks between Dingersjö and Sundsvall. Dingersjö – Kubikenborg is a 10-kilometer-long section of this double track extension. AFRY is commissioned to design and develop a railway plan for the route.Ostkustbanan is a 400-kilometer-long railway between Sundsvall and Stockholm and one of Sweden’s busiest railway sections. The conversion to double track allows for increased passenger and freight traffic as well as provides shorter journey times. The reconstruction is a