Stena Line marks significant milestones in build of NewMax ships, Stena Futura and Stena Connecta
Stena Futura set afloat, and keel laid on second ship to be named Stena Connecta Stena Line has reached another milestone in the build of its NewMax ships - launching Stena Futura into the water and laying the keel of the second ship, to be named Stena Connecta. Last week, Stena held a joint ‘launch’ and ‘keel-laying’ ceremony at the China Merchants Jinling Shipyard, Weihai, celebrating the release of Stena Futura into the water for the first time, and the laying of the keel for Stena Connecta, which marks the beginning of the build. Once operational, Stena Connecta and