V150-4.2 MW turbine surpasses 1 GW of orders in Brazil after seven months, underlining great fit with Brazil’s wind conditions
News release from Vestas Mediterranean Madrid, 31 May 2019 Brazilian energy company Echoenergia has placed a 97 MW order to supply and install 23 V150-4.2 MW turbines at the Serra do Mel wind park, located in the State of Rio Grande do Norte. The order is an extension of the 101 MW Serra do Mel project, which was Vestas’ first V150-4.2 MW turbine order in Brazil. The order takes Vestas’ firm order intake for the V150-4.2 MW in Brazil to 1,063 MW since October 2018, when the company announced plans to produce the turbine variant in Ceará. Reaching 1 GW in seven months underlines the