Tests for heavier transports on the Ore Railway
Trafikverket (the Swedish Transport Administration), together with LKAB and Bane Nor, is conducting tests on the Swedish and Norwegian sections of the Ore Railway to enable heavier transports in future. Therefore, the axle load for ore cars is being increased from 30 tonnes to 31 tonnes.“The purpose of the tests is to determine which stretches of the railway must be upgraded to enable an increase in the payload weight of cars operating on the line and thereby create a more efficient and environmentally friendly transport system. Quite simply, through testing, we want to determine how higher