Aker Solutions ASA: Aker Solutions signs Brasse contract
April 8, 2024 – Aker Solutions has been awarded a sizeable [1] EPCIC-contract for the Brasse tieback project for OKEA.Brasse is an oil and gas field located 13 kilometers south of the Brage platform. Brasse will be developed as a subsea tieback to Brage and will utilize the existing processing capacity on the platform, where the first production started in 1993. The tieback demands modifications on the Brage platform. The FEED has been carried out by Aker Solutions. Aker Solutions' scope is to execute engineering, procurement, construction, installation and commissioning on Brage to