New Engineering, Procurement and Construction Management (EPCM) services assignment for the LD Celulose S.A. pulp mill in Brazil
LD Celulose S.A. new dissolving pulp plant will produce 500,000 tons per year. The completion of the project is scheduled for 2022.LD Celulose S.A., a joint venture between Duratex and Lenzing group, awarded Pöyry, part of AFRY, with an EPCM (Engineering, Procurement, Construction Management) assignment for the BOP (Balance of Plant) of the plant that will have the capacity to produce 500,000 tons of dissolving pulp per year and will represent an investment of US $ 1.3 billion. The services provided by Pöyry, part of AFRY, include interconnections between all process areas, turbo generators