A record production year 2017 at Fortum’s Loviisa nuclear power plant
FORTUM CORPORATION PRESS RELEASE 3 January 2018 In 2017, Fortum’s Loviisa nuclear power plant had a record production year in the power plants’ history and generated a total of 8.16 terawatt hours (net) of power. On an international scale, the 92.7% load factor of the Loviisa nuclear power plant was among the best in the world for pressurised water reactor power plants. Loviisa unit 1’s load factor was 92.7% and Loviisa unit 2’s 92.6%. Production output of Loviisa unit 1 was the best and Loviisa unit 2's production output was the second highest in the history of the plant.This year