SOTKAMO SILVER AB: PRODUCTION UPDATE Q1 2020
Press release: Stockholm, April 14, 2020 14.15 CETDuring the first three months of 2020 ca. 129 kt of ore was processed at the Silver Mine. This yielded ca. 391 000 ounces of silver, 462 tons of lead, 958 tons of zinc and 998 ounces of gold in the concentrates. Production Q1-2020 Q1-2019 YTD 2020 2019Processed Ore (ton) 129 000 0 129 000 342 800Silver head grade g/ton 110 0 110 119Silver ounces 391 000 0 391 000 1 000 000Gold ounces 998