CO2 Capsol gains traction in carbon capture from Waste-to-Energy – Awarded contract for a feasibility study from KVA Linth
Oslo, Norway - 16 March 2023CO2 Capsol has been selected by KVA Linth to conduct a feasibility study for theCapsolEoP™ (end-of-pipe) carbon capture technology at a Waste-to-Energy plantlocated in Switzerland. Once modernised in 2025, the plant has a carbon capturepotential of more than 100,000 tonnes of CO2 per year, of which half of the CO2comes from biogenic sources.“We are pleased to be awarded this feasibility study with KVA Linth, which is aconfirmation of our strong traction for carbon capture within theWaste-to-energy industry. Since a large part of the waste has