Fazer consolidates oat drink production to its Tingsryd factory in Sweden
The change negotiations in Fazer’s Plant-Based Drinks business have been concluded. Fazer has decided to consolidate the production of its oat drinks and oat-based cooking products from Koria, Finland to its Tingsryd factory in Sweden. The transition will occur gradually, with an estimated completion of production in Koria by autumn 2024. In the future, the Koria factory will focus on producing gurts. As a result of the change negotiations, 64 permanent employments will be terminated in Finland.The slowdown of growth[1)] in the consumption of plant-based drinks, as well as increased