Engebø Rutile and Garnet; update on feasibility study
Following from the successful completion of the prefeasibility study (PFS) for the Engebø rutile and garnet project in October 2017, a comprehensive work program related to the definitive feasibility study (DFS) is now progressing. The work program includes i.a. geological and geotechnical assessments, process optimisation and verification, mine design and detailed engineering and preparations related to project execution.The international engineering and consultancy company Hatch has been appointed for technical advisory services and coordination of the DFS. Hatch was also the technical