USNRC Approval Improves Access to Studsvik’s CMS5 Software
Operators of pressurized water reactor (PWR) nuclear power plants in the U.S. will have easier access to Studsvik Scandpower’s state-of-the-art nuclear fuel analysis technology following approval by the U.S. Nuclear Regulatory Commission (NRC) of a generic license for Studsvik’s Core Management System 5 (CMS5).Studsvik filed its application with the NRC in December 2015. “Pursuing the generic license required a significant financial investment, and the dedication over several years by our exceptional nuclear and technology engineering staff,” said Steven Freel, president of Studsvik