Moelven Edanesågen increases capacity with continuous kiln from Valutec
As part of its efforts to gradually increase capacity, Moelven Edanesågen in Värmland has invested in a continuous kiln, with associated Valmatics control system, from Valutec. Installation of the kiln will begin in January 2016, and it will increase drying capacity at the plant by 40,000 m3 per year.“We are constantly working to improve, and we felt that there was a bottleneck within our timber drying activities. We have a long-standing partnership with Valutec and we have been highly satisfied with their service. So, when faced with this investment, we chose the competitive option offered