Interim report January - September 2019: Azelio puts the pieces in place for volume production in 2021, as planned
The third quarter saw the start of another verification project, which in parallel with the verification in Morocco will pave the way for Azelio’s groundbreaking technology. Together with Abu Dhabi Future Energy Company (Masdar) and Khalifa University of Science and Technology, Azelio plans to launch a pilot project in Abu Dhabi aimed at evaluating Azelio’s technology for Masdar’s existing and future projects in renewable energy. In Sweden, meanwhile, the first industrially produced Stirling engine for the Thermal Energy Storage application left the production line at the factory in