Outokumpu stainless steel secures public transportation in Stockholm for the future
OUTOKUMPU OYJPRESS RELEASEFebruary 6, 2017 at 10 am EET Outokumpu delivers 600 tonnes of Forta LDX2404 stainless steel for renovating the Söderströmsbron in Stockholm, Sweden. The bridge complex, connecting Stockholm Old town to the Södermalm district, consists of four railway bridges that need to be renovated. The 174-meter long bridges, built originally of carbon steel in 1957, are critical for the city’s subway traffic: daily over 330,000 trips are made via the bridge. The bridge is now being repaired for safer travel and higher traffic volumes in the future. Old bridge beams