SOTKAMO SILVER AB: SILVER MINE DRILLING RESULTS FOR 2022 PUBLISHED – RESULTS ARE GOOD AND SUPPORT THE TARGET OF INCREASING THE SILVER PRODUCTION
Press release: Stockholm, December 14, 2022 11:25 CET Sotkamo Silver reports drill results from drilling programs carried out in Q4/2021–Q3/2022 at the Silver Mine in Sotkamo. In the drilling programs underground drilling was concentrated in the production areas for the coming years and surface drilling to the known lower part of the mineralization and areas open beside it, reaching a depth of about 700 meters. The results of underground drilling support the previous positive view of higher concentrations in the next planned production area between production levels 360 -