Wärtsilä to provide flexible engines to U.S. power cooperative, yielding 108 MW of balancing capacity to ensure reliable, affordable and responsible electricity
Wärtsilä Corporation, Press release, 25 January 2023 at 2 PM EETThe technology group Wärtsilä will supply the generating capacity for a new balancing power plant being built in the U.S.A. The Pioneer Generation Station Phase IV power plant project is located in North Dakota and will provide Basin Electric Power Cooperative with the flexible gas generation needed to balance the inherent variability of energy from renewable sources, notably wind and solar. This balancing capability will enable Basin Electric to expand its generation to ensure reliable, affordable and responsible power to its