LKAB reduces production volumes in Kiruna
Production conditions in the Kiruna mine mean that LKAB is implementing changes to ensure long‑term operations and delivery capacity. One of the pellet plants will be temporarily shut down from mid-April, with production expected to remain halted until November. This will result in a reduction in deliveries of approximately two million tonnes.“Changing local rock mechanical conditions mean that we need to adjust the mining sequence. As a result, we will temporarily reduce production in the mine, which in turn will decrease volumes to the pellet plants during this period. Through these