Havfram Wind to install turbines at Ørsted`s Hornsea 3 offshore wind farm
March 21[st], 2023 – Oslo, Norway – Ørsted, global offshore wind leader, has appointed Havfram Wind to install turbines at its Hornsea 3 offshore windfarm, starting autumn 2026. Havfram Wind will be utilizing one of its newly built NG20000X Jack-Up Wind Turbine Installation vessels (WTIV) with a 3.250-ton crane.Hornsea 3 will consist of up to 231 offshore wind turbines, located within a 696 square kilometer area, approximately 120 km off the Norfolk coast and 160 km off the Yorkshire coast. With a capacity of 2,852 MW, Hornsea 3 will be capable of producing enough low-cost, clean, renewable