FREYR advances the development of its initial site for Norway ’ s first battery cell facility
FREYR continues to advance the development of Norway’s first lithium-ion battery cell (LIB) facility and are currently optimising the basis for the 2 GWh Fast Track production facility together with local site partner Mo Industrial Park (MIP). Today, the ongoing collaboration between FREYR and MIP was further formalised by the signing of a Memorandum of Understanding (MoU) for the planned Fast Track production facility site. The site is “plug and play” with all infrastructure ready and available area will furthermore be increased from 40.000 m2 to 70 000 m2. “Our ambition is to make