Electricity generation at Olkiluoto 2 will be suspended for about two days
Power generation at the Olkiluoto 2 plant unit (OL2) will be suspended on Friday, 27 January pending the repair of a valve malfunction.The power downgrade will begin at 5 p.m. on Friday and the plant will be disconnected from the grid at around 7 p.m. OL2´s electricity generation will resume on Sunday, 29 January. The plant unit will be paced back online on Sunday afternoon, after which a power increase will begin. Increasing the power takes about 50 hours. The issue has no impact on nuclear safety.