Vestas wins 40 MW order from Italian auction
The 40 MW order is for the Lavello wind park and is placed by Bel Lavello Vigi, a joint venture between Belenergia, mostly active in Italy, and Langa/Rgreen Invest, a leading French operator. The order takes Vestas’ announced orders in Italy in 2017 to 116 MW and order intake from Italian auctions to almost 790 MW over the last five years. Having installed more than 40 percent of Italy’s total wind installed capacity, Vestas underlines its market leadership with today’s order. The contract for the Lavello wind park includes the supply and installation of 12 V126-3.3 MW wind turbines and