Increased resource estimates for the Engebø deposit
As a result of the limited drilling program at Engebø in January/February 2018, the estimated mineral resources in the measured and indicated categories have increased by around 5%, to approximately 98 million tonnes, based on a cut-off of 3% TiO2. The average grade of rutile and garnet is 3.87% and 44.4%, respectively. The main purpose of the drilling program was geotechnical investigation within the open pit area, and in this respect the campaign has provided valuable information for the mine planning.Main results In January/February 2018, a limited drilling program of around 1,580