Wärtsilä to develop regasification system for new offshore LNG terminal in India
Wärtsilä Corporation, Press release, 05 July 2021 at 09:00 AM EESTThe technology group Wärtsilä will develop the regasification system for a new offshore LNG terminal to be built in the Bay of Bengal. The project is headed by Crown LNG, a Norwegian group specialising in developing LNG infrastructure for harsh weather conditions, with Oslo-based engineering company Aker Solutions as the main contractor. Wärtsilä Gas Solutions will conduct the front-end engineering and design (FEED) of the regasification system. The early phase of the FEED contract was booked in May 2021. Final Investment