Vestas receives 281 MW order of V150-4.2 MW turbines in Brazil
News release from Vestas MediterraneanMadrid, 28 June 2019 Vestas has received a 281 MW order for three wind parks in Brazil through a non-regulated power purchase agreement. The contract includes the supply and installation of 67 V150-4.2 MW turbines that will be locally produced under the Brazilian Development Bank (BNDES) FINAME II rules at the Vestas’ factory in Ceará. “The V150-4.2 MW turbine continues to make the difference in the Brazilian market by offering very competitive levelised cost of energy that offers an attractive long-term investment for our customers”, highlights